PROJECT
12-16 St James, London
CLIENT
The Crown Estate
ARCHITECT
Suttonca
VALUE
Confidential
Following the strip out we returned the space on levels 4 and 5 back to Cat A standard, replaced the windows ready for letting. At high level, a detailed raft ceiling system conceals the new M&E services installed within a very confined ceiling void and a maze of structural beams. These works required new fan coil unit ventilation and new roof plant.
In need of modernisation, the WC facilities on each floor were stripped out and reconstructed to an extremely high specification consisting of walnut, marble, handmade terracotta tiling and brass. The lift lobbies also have a similar design with fluted marble panels, patinate brass and herringbone timber flooring.
Andy Smith
Operations Director
Leigh Cunningham
Project Manger
Ben Carpenter
Project Manager
Darryl Dillon
Assistant Project Manager
Chris Pratt
Commercial Director
Scott Payne
Commercial Manager
Elle Stevens
Assistant Commercial Manager
Sam Greaves
Services Manager