We use cookies to help you navigate efficiently and perform certain functions. You will find detailed information about all cookies under each consent category below.
The cookies that are categorized as "Necessary" are stored on your browser as they are essential for enabling the basic functionalities of the site. ...
Necessary cookies are required to enable the basic features of this site, such as providing secure log-in or adjusting your consent preferences. These cookies do not store any personally identifiable data.
Functional cookies help perform certain functionalities like sharing the content of the website on social media platforms, collecting feedback, and other third-party features.
Analytical cookies are used to understand how visitors interact with the website. These cookies help provide information on metrics such as the number of visitors, bounce rate, traffic source, etc.
Performance cookies are used to understand and analyze the key performance indexes of the website which helps in delivering a better user experience for the visitors.
Advertisement cookies are used to provide visitors with customized advertisements based on the pages you visited previously and to analyze the effectiveness of the ad campaigns.
CLIENT
Landsec
ARCHITECT
Trehearne Architects
VALUE
Confidential
Our fit out of one floor at Dashwood House subsequently led to the refurbishment of six additional floors (Levels 1, 3, 10, 11, 12).
This scheme was delivered within an occupied building, with multiple floors at various stages of the programme fitted out simultaneously over 48 weeks.
Each level was split 70/30, 50/50 or left as an entire floor, with alterations made to the design scheme to suit.
Works to level three involved constructing a reception area with an adjoining lounge, breakout space with kitchen facilities, and cellular offices with glazed partitions and meeting rooms.
Mechanical works comprised moving existing FCUs and reconfiguring pipework and ductwork to accommodate the new layout. Electrical works included revising the existing lighting and the installation of new lighting, switches, and low-level small power and cleaner sockets.
James Suatt
Project Manager
Harry James
Assistant Project Manager
Sam Greaves
Services Director
Tom Hajduczek
Services Manager
Mark Raison
Commercial Manager
Dean Mythen
Commercial Director
James Rogers
Project Director
Greg Lloyd
Operations Director