PROJECT
77 Shaftesbury Avenue, London
CLIENT
Technology Company
ARCHITECT
EDGE
VALUE
Confidential
Exposed services provide an urban ‘industrial feel’ coupled with modern fittings and finishes. The fit out also features many bespoke elements such as flooring and joinery, with timber veneer panelling throughout and a reception desk specially designed to reflect the company’s branding.
The project was delivered as a fast-track design and build scheme to a 10-week programme. Challenges such as tight logistics and working within an occupied building were all resolved through efficient project management and consistent dialogue with all of the parties involved.