Blog

Keep in the loop with our latest stories, news and reviews

Recently Completed Projects

Here’s a quick look at some of our recently completed fit-out and refurbishment projects:

The Office Group  |  1 Canada Square | London 

Flexible office provider The Office Group engaged our team once again to undertake the prestigious fit-out of three floors at the iconic One Canada Square tower in Canary Wharf. This 80,000 sq ft project included reception space, private offices, a state-of-the-art gym, breakout space and co-working areas. The three floors were connected by a new steel and timber staircase installation, which features a Sapele handrail, fluted rear walls and Sapele treads. 

For further info, please view our project profile here.

Palm Capital |   Abbey Gardens | Reading

This 24-week project saw our team undertake a 40,000 sq ft Cat A & B fit-out for real estate private equity firm, Palm Capital. The project included three floors of Cat A works including the replacement of ceilings, alterations to services to suit the new layout including power and lighting. The Cat B elements included creating a new comms room, new raft ceiling and floor finishes, meeting room and new tea point with an island feature.

For further info, please view our project profile here.

British Land/ Storey 19-23 | Wells Street | London

19 – 23 Wells Street is a Grade 2 listed building located in Fitzrovia and continuing our relationship with British Land/Storey we undertook the complete refurbishment of the building. The 35,000 sq ft space included the Cat A & B fit-out of all seven floors. We constructed a new roof terrace, kitchen and decking area and installed changing rooms, showers, bike store, bin store and plant room areas within the basement. Internally floors 1-5 were converted to open-plan offices complete with tea points, phone booths and glass meeting rooms. On the ground floor, we created a new reception with a new staircase and lift entrance. 

For further info, please view our project profile here

Parkeray’s COVID-19 Update

Please click here for an update on our current status and approach to COVID-19.

827 thoughts on “Recently Completed Projects”

  1. Hear Res 346 62 70 priligy generic We used clomid on and off for two years before discovering both tubes were blocked, opened one, did iui once on 50mg then got pregnant the second time turns out the first time I ovulated on the closed side but it hadn t been determined to actually be closed until after the iui I got pregnant with twins after sex alone for six months after tubal opening

  2. Hi there! Do you know if they make any plugins to assist with Search Engine Optimization?
    I’m trying to get my blog to rank for some targeted keywords but I’m not seeing very good results.
    If you know of any please share. Cheers! I saw similar text here: Wool product

Leave a Reply

Your email address will not be published. Required fields are marked *