PROJECT
Level 1, phase 2 Central Library, Sherfield Building,
Imperial College London
CLIENT
Imperial College London
ARCHITECT
A-EM Studio
VALUE
£4.7m
Parkeray has been a framework partner with Imperial College London since 2006. This Phase 2 of a 4 phase central library project involved the internal fit out of new entrance, library reception, café, research space, break out and teaching areas, plus curtain walling to previous existing structural extension, from shell & core.
This project received 3 awards in 2009, the Association of Interior Specialists (AIS) gold award for projects above £1million, The CIOB Construction Manager of the Year silver award and a RIBA award.