CLIENT
Landsec
ARCHITECT
Trehearne Architects
VALUE
Confidential
Our fit out of one floor at Dashwood House subsequently led to the refurbishment of six additional floors (Levels 1, 3, 10, 11, 12).
This scheme was delivered within an occupied building, with multiple floors at various stages of the programme fitted out simultaneously over 48 weeks.
Each level was split 70/30, 50/50 or left as an entire floor, with alterations made to the design scheme to suit.
Works to level three involved constructing a reception area with an adjoining lounge, breakout space with kitchen facilities, and cellular offices with glazed partitions and meeting rooms.
Mechanical works comprised moving existing FCUs and reconfiguring pipework and ductwork to accommodate the new layout. Electrical works included revising the existing lighting and the installation of new lighting, switches, and low-level small power and cleaner sockets.
Tommy Faulkner
Project Manager
James Suatt
Project Manager
Harry James
Assistant Project Manager
Sam Greaves
Services Director
Tom Hajduczek
Services Manager
Mark Raison
Commercial Manager
Dean Mythen
Commercial Director
James Rogers
Project Director
Greg Lloyd
Operations Director