PROJECT
Douglas House, Great Titchfield Street, London
CLIENT
TOG (The Office Group)
ARCHITECT
Opera & smok Ltd
VALUE
Confidential
We carried out the complete strip out of all internal finishes followed by the Cat A and B fit out of serviced office accommodation across 8 floors. This multi-floor building includes internal office accommodation, meeting rooms, lounge spaces, breakout areas, and a roof terrace. The building also boasts a meditation room, full working gym, and shower facilities with new WC facilities on all levels.
Services installation consisted of new mechanical and electrical infrastructure throughout. Constructed was a new substation with UKPN at ground floor level with adjacent electrical switch room, new mains switch panel, and new acoustic enclosure condenser farms at roof level to supply the new on floor VRF. New LED lighting was installed throughout with feature lighting to enhance each individual space. New passenger lifts were installed and a DDA platform lift to access the roof deck.
Graham Ward
Project Director
Ross Allen
Project Manager
Daron Simpson
Project manager
Joe Hanrahan
Project Manager
Joseph Till
Project Manager
Chris Pratt
Commercial Director
Dean Mythen
Commercial Manager
Elle Stevens
Assistant Commercial Manager
Steve Mott
Services Director
Chris White
Services Manager
Jon Pye
Operations Director